
144 Addison Apartment Common Spaces
Scope - A very sizeable amount of finished OSB millwork and two steel planter structures fabricated and installed.
Role - I sanded every sheet of OSB in the shop, cut 30 into epoxy miters, transported over a hundred pieces to the site, prepped each wall with "z clips" and hung every single panel. I am most proud of the scribing done on-site and the consistent panel gaps, especially given how horrendously warped the walls were.










I also contributed to this steel shelving. I blackened both structures, drilled holes for the planters, and helped build the planters in the shop before assisting in the installation of the whole assembly.




Lamplighter Cambridge Crossing
Scope - Two full bar stations with tops mounted at different heights fabricated and installed.
Role Performed - Assisted in the entire fabrication process except for finishing. I processed each board from raw stock, glued up every width, trimmed them to size, sanded, and routed hardware recesses with a partner. I then installed them alongside a small crew.


Workflow Boston's Showroom Space
Scope - A mitered waterfall countertop fabricated and installed.
Role - I completed every part of this job from receiving the raw stock to installation with the exception of finish application. I processed each board, glued them up into slabs, trimmed the slabs to size, mitered them, routed the edges, sanded, and installed them with almost no on-site adjustment.



